|
|
|
|
Home > Projects > Airport |
|
Project |
|
Hajj Terminal – King Abdul Aziz |
|
Size & Scale |
- Terminal Built-up Area: 70,000 square meters
- Terminal Capacity:
- Arrival: 3,800 passengers / hour
- Departure: 3,500 passengers / hour
- Unique worldwide design: The entire terminal can switch between arrival and departure modes.
|
|
Key Differentiators |
- Converged IP Network with wireless coverage
- Over 4,500 service outlets
- Record implementation time (4 months – design to deployment) adopting a comprehensive pre-staging approach.
- Design development and coordination in one month time (parallel to construction schedule)
- Services Implemented:
- IP Access Control System
- IP CCTV System
- IP Public Address System
- Fire Alarm & Detection System
- IP Master Clock System
- IP Telephony System (Wired & Wireless)
- IP Advertisement System
- Wireless Local Area Network (WLAN)
- High Speed Internet Services
- Data Services
- Airport Operation Database (AODB)
- Flight Information Display System (FIDS)
- Baggage Information Display System (BIDS)
- Common Use Terminal Equipment (CUTE)
- Baggage Reconciliation System (BRS)
- Resource Management System (RMS)
- Visual Guidance Docking System (VGDS)
- Building Management System (BMS)
- Security Screening System
|
|
Pre-Design, Design, Build, and Operation all done by BTAT |
| |
|
| |
|
Project |
|
New Terminal at Sharm El Sheikh International Airport |
|
Location |
|
Sharm El Sheikh, Egypt |
|
Size & Scale |
- Terminal Built-up Area: 43,000 square meters
- Terminal Capacity: 4 million passengers / year
|
|
Key Differentiators |
- Converged IP Network
- Over 1,300 service outlets
- Wired & Wireless IP Telephony implementation for entire terminal
- Specialized airport operations systems including:
- Flight Information Display System (FIDS)
- Common Use Terminal Equipment (CUTE)
- Baggage Reconciliation System (BRS)
- Airport Operations Database (AODB)
|
|
Built entirely by BTAT | | |
|
|
|
|
|
|
|